TENDER DOCUMENT
NIT No.: DLI/C&E/WI-675/263
FOR
Tender for Design, Supply & Supervision of installation,
testing and commissioning of AIR COMPRESSORS,
RECEIVERS AND COOLING TOWERS‟ for the project of
“Augmentation of Fuel and Flux crushing facilities
(Package- 064) of Bhilai Steel Plant, (SAIL)”.
VOLUME 2B
TECHNICAL SPECIFICATION
ENGINEERING PROJECTS (INDIA) LIMITED
(A GOVT. OF INDIA ENTERPRISE)
Core-3, Scope Complex, 7, Institutional Area,
Lodhi Road, New Delhi-110003
TEL NO: 011-24361666 FAX NO. 011- 24363426
Vue de la page 0
1 2 3 4 5 6 ... 115 116

Résumé du contenu

Page 1 - TECHNICAL SPECIFICATION

TENDER DOCUMENT NIT No.: DLI/C&E/WI-675/263 FOR Tender for Design, Supply & Supervision of installation, testing and commiss

Page 2 - GENERAL

EPI – New Delhi Volume-2B, Rev.0 Page 9 of 11 LIST OF PREFERRED MAKES

Page 3 - 2.0 SCOPE OF SUPPLY

CHAP-04.11 AUTOMATION Page 3 of 15  Conveyors feeding to Augmentation in Flux - Fuel Preparation and Plant Return Fines Handling for SP III i.e. C

Page 4 - Cooling Towers:

CHAP-04.11 AUTOMATION Page 4 of 15 with CHP (Pkg-062), new Coke Oven Battery-11 & existing plants / shops as per Technological Mate

Page 5 - A) AIR COMPRESSORS

CHAP-04.11 AUTOMATION Page 5 of 15 (MEC/S/9101/11/E9/55/01/064.02/R1)for CSP and (Drg. No: MEC/S/9101/11/E9/55/01/064.04/R3)MEC/S/9101/ 11/E9/0/

Page 6 - Page 5 of 11

CHAP-04.11 AUTOMATION Page 6 of 15 20. Power & Control Supply monitoring of all mechanisms will be provided through PLC. 21. Status of UPS to

Page 7 - Page 6 of 11

CHAP-04.11 AUTOMATION Page 7 of 15 The scope of work and supply will include but not limited to the following: 1. Automation system as per the

Page 8 - Page 7 of 11

CHAP-04.11 AUTOMATION Page 8 of 15 Contactor will also consider input interposing relays for field mounted proximity switches in the I/O chassis. 3.

Page 9 - Page 8 of 11

CHAP-04.11 AUTOMATION Page 9 of 15 12. Fully wired cabinets/ panels, etc with MCBs, Fuses, CFL Lamps, Universal type service sockets, Eart

Page 10 - Page 9 of 11

CHAP-04.11 AUTOMATION Page 10 of 15 22. Contactor will involve Employer / Mecon in control philosophy development, design of application sof

Page 11 - Page 10 of 11

CHAP-04.11 AUTOMATION Page 11 of 15 05. All the new MCCs of CHP and CSP and MCPs of CHP, CSP and FFP will be of Intelligent Type. i.e. e

Page 12

CHAP-04.11 AUTOMATION Page 12 of 15 automation permission. For this purpose, specific menu will be provided with operator workstation for suc

Page 13 - Page 1 of 20

EPI – New Delhi Volume-2B, Rev.0 Page 10 of 11 DIGITAL INDICATORS : YO

Page 14 - Page 2 of 20

CHAP-04.11 AUTOMATION Page 13 of 15 Route wise operation of offered CHP (under Pkg-064) of the Contactor and Coal transportation system (under Pkg-06

Page 15 - Page 3 of 20

CHAP-04.11 AUTOMATION Page 14 of 15 03. Control room and Despatcher will also have facility of Toilet block. Central control room will h

Page 16 - Page 4 of 20

CHAP-04.11 AUTOMATION Page 15 of 15 02. Input/ Output list. 03. Terminal diagram of all the RI/O & Marshalling panels. 04. Cable schedule a

Page 17 - Page 5 of 20

EPI – New Delhi Volume-2B, Rev.0 Page 1 of 4 DAT

Page 18 - Page 6 of 20

EPI – New Delhi Volume-2B, Rev.0 Page 2 of 4 01.00 TECHNIC

Page 19 - Page 7 of 20

EPI – New Delhi Volume-2B, Rev.0 Page 3 of 4 Space requ

Page 20 - Page 8 of 20

EPI – New Delhi Volume-2B, Rev.0 Page 4 of 4 Capacity

Page 21 - Page 9 of 20

EPI – New Delhi Volume-2B, Rev.0 Page 11 of 11 B) AIR RECEIVERS 1 no. o

Page 22 - Page 10 of 20

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 1 of 20 03.00 BRIEF SYSTEM DESCRIPTION 03.01 DESCRIPTION OF EXISTING COAL HANDLING PLANT 03.01.01 Coal

Page 23 - Page 11 of 20

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 2 of 20 capacity from the storage yard to the top of the storage cum blending bunkers is 800 tph. v) Coal i

Page 24 - Page 12 of 20

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 3 of 20  Connecting conveyor for new silos & new crushers to the existing Coal Handling Plant. 

Page 25 - Page 13 of 20

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 4 of 20 existing conveyors Y14 & Y18. These two conveyors shall have stand-by drives. The upgraded convey

Page 26 - Page 14 of 20

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 5 of 20 Each junction house shall be provided with Electric hoist. The Capacities of EOT Cranes / Electric

Page 27 - Page 15 of 20

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 6 of 20 trippers will be provided for storage of coke. Coke will be reclaimed by an underground reclaiming co

Page 28 - Page 16 of 20

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 7 of 20 The air blasting unit shall consist of air intake louver, transition piece, centrifugal blasting fa

Page 29 - Page 17 of 20

EPI – New Delhi Volume-2B, Rev.0 Page 1 of 11 GENERAL The following Technical

Page 30 - Page 18 of 20

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 8 of 20 - 2 nos. vibrating screens, (30 mm) capacity 300 t/h. Screen wires should be 5 mm dia SS. - 2 nos.

Page 31 - Page 19 of 20

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 9 of 20 height shall have electric hoists. Under slung & EOT cranes as required in CS and other handling

Page 32 - Page 20 of 20

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 10 of 20 13. Yard reclaim conveyor K11-10D shall be 1600mm wide with 35° troughing angle and without skirt bo

Page 33 - Page 1 of 15

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 11 of 20 24. Wagon loading shall be provided for BF coke in the coke screening station of CSP-4. 25. Maint

Page 34 - Page 2 of 15

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 12 of 20 03.04 Brief System Description of Augmentation in Flux - Fuel Preparation and Plant return fines ha

Page 35

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 13 of 20 1. Lime Stone (received from Koteswar) Max Min - % + 75 mm - 2.0% - 75 mm to + 60 mm

Page 36

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 14 of 20 5 BF sinter return fines - 8 mm +8mm (5% max.) 6 Flue dust - 1 mm +1mm (5% max.) 03.04.02 A

Page 37

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 15 of 20 vibro feeder (6nos.) and fed to flux screens (6 nos.) for screening -3mm size fraction. The under si

Page 38

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 16 of 20 from bunker and feed either to the two roll crusher or bypass the crusher and feed to conveyor C107A

Page 39 - Page 7 of 15

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 17 of 20 the conveyor L105 to surge bin of existing flux crushing building. It is proposed to extend the exis

Page 40

EPI – New Delhi Volume-2B, Rev.0 Page 2 of 11 2.0 SCOPE OF SUPPLY The sco

Page 41

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 18 of 20 Flow diagram and Layout drawing for Proposed Fuel and Flux Crushing and Screening Facility of Sin

Page 42

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 19 of 20 conveyor C5-C1 & C5-C2 respectively at JH-C4. Conveyor gallery C5-C1 & C5-C2 shall cross ove

Page 43

CHAP-03 BRIEF SYSTEM DESCRIPTION Page 20 of 20 Rerouting of these conveyor series shall be so meticulously planned that minimum shut down is requ

Page 44

CHAP-04.09 INSTRUMENTATION & CONTROL Page 1 of 15 04.09 INSTRUMENTATION & CONTROL 04.09.01 GENERAL 01. This document is i

Page 45

CHAP-04.09 INSTRUMENTATION & CONTROL Page 2 of 15 For high level interlock, suitable contact type level switches to be considered. 07

Page 46

CHAP-04.09 INSTRUMENTATION & CONTROL Page 3 of 15 instrumentation system in all respect along with site fabrication, erection, testing,

Page 47

CHAP-04.09 INSTRUMENTATION & CONTROL Page 4 of 15 14. Arrangement of and participation in inspection of Instrumentation equipment by Employer/

Page 48 - Page 1 of 50

CHAP-04.09 INSTRUMENTATION & CONTROL Page 5 of 15 be provided. These signals will also be hooked up with the automation system for alarms and ne

Page 49 - Page 2 of 50

CHAP-04.09 INSTRUMENTATION & CONTROL Page 6 of 15 05. Single line power supply diagram with document and bill of quantities of elect

Page 50 - Page 3 of 50

CHAP-04.09 INSTRUMENTATION & CONTROL Page 7 of 15 RMS measurement of AC voltage and current. 2. Laptop based programmer for level transmitter

Page 51 - Page 4 of 50

EPI – New Delhi Volume-2B, Rev.0 Page 3 of 11 6) Equipment selection and d

Page 52 - Page 5 of 50

CHAP-04.09 INSTRUMENTATION & CONTROL Page 8 of 15 1.2 A). Pressure / Differential Pressure switches. (Mech. Type) B). Pressure / Diff

Page 53 - Page 6 of 50

CHAP-04.09 INSTRUMENTATION & CONTROL Page 9 of 15 4. Impac, 5. Keller HCW 3 FLOW INSTRUMENTS 3.1 Rotameters 1. Forbes-Marshall, 2. Chem

Page 54 - Page 7 of 50

CHAP-04.09 INSTRUMENTATION & CONTROL Page 10 of 15 4.1 Level gauge (magnetic & reflex type) 1. Chemtrol 2. Forbes Marshall 3. Mobrey 4.

Page 55 - Page 8 of 50

CHAP-04.09 INSTRUMENTATION & CONTROL Page 11 of 15 5.1 Control valve 1. Fisher-Xomox 2. Instrumentation Ltd 3. Masoneilan 4. Valflo 5. Sa

Page 56 - Page 9 of 50

CHAP-04.09 INSTRUMENTATION & CONTROL Page 12 of 15 6. Forbes Marshall (Arca) 7. ABB 5.9 Solenoid Valve 1. Herion, 2. Rotex 3. Schrader-Sch

Page 57 - Page 10 of 50

CHAP-04.09 INSTRUMENTATION & CONTROL Page 13 of 15 6. ABB 7. Micro controls 8. Radix 7.4 Bar graph Indicator 1. Masibus Instruments 2. L

Page 58 - Page 11 of 50

CHAP-04.09 INSTRUMENTATION & CONTROL Page 14 of 15 7.11 Annunciation system 1. IIC 2. Minilec 3. Procon 4. Digicont 5. MTL 6. BETA instrum

Page 59 - Page 12 of 50

CHAP-04.09 INSTRUMENTATION & CONTROL Page 15 of 15 8.8 Vibration sensors & monitors A. For turbines and other high speed critical machines

Page 60 - Page 13 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 1 of 50 04.10 ELECTRICAL POWER DISTRIBUTION,

Page 61 - Page 14 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 2 of 50 scope of Contractor. Power to all the HT

Page 62 - Page 15 of 50

EPI – New Delhi Volume-2B, Rev.0 Page 4 of 11 Design ambient condition

Page 63 - Page 16 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 3 of 50 easily accessible for maintenance, replac

Page 64 - Page 17 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 4 of 50 as required for completion and succe

Page 65 - Page 18 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 5 of 50  Generally Squirrel Cage Induction Moto

Page 66 - Page 19 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 6 of 50 in this package of FFP. Suitable control

Page 67 - Page 20 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 7 of 50 coupler for repair network like weld

Page 68 - Page 21 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 8 of 50  Addressable type PCS, Addressable

Page 69 - Page 22 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 9 of 50 cables for shuttle conveyors, EOT cranes

Page 70 - Page 23 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 10 of 50 be provided in underground floor of

Page 71 - 04.10.13.01. General

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 11 of 50 Pkg-064, will be interfaced with Au

Page 72 - Page 25 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 12 of 50 concrete cable trenches, MCC Rooms, Desp

Page 73 - Page 26 of 50

EPI – New Delhi Volume-2B, Rev.0 Page 5 of 11 iii) Contractor has to furni

Page 74 - Page 27 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 13 of 50 control rooms, cable cellars, cable tunn

Page 75 - Page 28 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 14 of 50 2. Arranging construction power supp

Page 76 - Page 29 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 15 of 50 15. Cables of one area/conveying route

Page 77 - Page 30 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 16 of 50 04.10.06. Design basis for equipments

Page 78 - Page 31 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 17 of 50 - All equipment will strictly confo

Page 79 - Page 32 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 18 of 50 - Illumination levels of all units w

Page 80 - Page 33 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 19 of 50 - HPSV lamp fittings will be provided

Page 81 - Page 34 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 20 of 50 04.10.10. Control and Operational Requi

Page 82 - Page 35 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 21 of 50  REMOTE interlocked route wise co

Page 83 - Page 36 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 22 of 50 d) Selection of control mode in REMOTE

Page 84 - Page 37 of 50

EPI – New Delhi Volume-2B, Rev.0 Page 6 of 11 CONTROL & INSTRUMENTATION

Page 85 - Page 38 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 23 of 50 bearings and winding temperature. c)

Page 86 - Page 39 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 24 of 50 existing drives (to be upgraded as

Page 87 - Page 40 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 25 of 50 pad. Weatherproof enclosures will

Page 88 - Page 41 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 26 of 50 04.10.13.03. Motorized Damper, Switc

Page 89 - Page 42 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 27 of 50 actuator for testing and maintenance pur

Page 90 - Page 43 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 28 of 50 belt switch depend upon selection of con

Page 91 - Page 44 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 29 of 50 sides for power supply to solenoid valve

Page 92 - Page 45 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 30 of 50 cleaning operation of the bag filte

Page 93 - Page 46 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 31 of 50 SL. NO. UNITS ILLUMINATION LEVEL (LUX

Page 94 - Page 47 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 32 of 50 proposes to submit within 2 weeks of LOI

Page 95 - Page 48 of 50

EPI – New Delhi Volume-2B, Rev.0 Page 7 of 11 3) Temperature of air after ai

Page 96 - Page 49 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 33 of 50 interlocking and other schematics. 7.

Page 97 - Page 50 of 50

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 34 of 50 22. Scheme for Illumination system

Page 98

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 35 of 50 wiring diagram and circuit diagrams. 11

Page 99

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 36 of 50 2. HT/LT feeder requirement with indivi

Page 100 - Page 3 of 15

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 37 of 50 22. Detailed technical literature / ca

Page 101 - Page 4 of 15

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 38 of 50 34. Other Drawings/documents : a)

Page 102 - Page 5 of 15

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 39 of 50 10. As built drawings will be first Cop

Page 103 - Page 6 of 15

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 40 of 50  RATED VOLTAGE :  85 % OF RATED V

Page 104

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 41 of 50 39. LOCATION OF TERMINAL BOX : POS

Page 105 - Page 8 of 15

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 42 of 50 3. Testing Jig for PLC (OEM supplied)

Page 106 - Page 9 of 15

EPI – New Delhi Volume-2B, Rev.0 Page 8 of 11 GUARANTEE AND PENALTIES The Co

Page 107 - Page 10 of 15

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 43 of 50  Thumb drives  Backup Tape for Serve

Page 108 - Page 11 of 15

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 44 of 50 1 HT Bushing 1 No. 2 Winding temperature

Page 109 - Page 12 of 15

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 45 of 50 19. Ammeters -DO- 20. Amme

Page 110 - Page 13 of 15

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 46 of 50 12. Fused terminals with LED -DO- 13. Sp

Page 111 - Page 14 of 15

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 47 of 50 type & rating)

Page 112 - Page 15 of 15

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 48 of 50 ANNEXURE – E-03 ADDITIONAL POINTS FOR A

Page 113 - Page 1 of 4

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 49 of 50 ANNEXURE-E04 SL. NO. DESCRIPTION 1. T

Page 114 - Page 2 of 4

CHAP-04.10 ELECTRICAL POWER DISTRIBUTION, DRIVES, CONTROL & ILLUMINATION ELECTRICAL Page 50 of 50 NO. 1. All HT motor will have FCMA bas

Page 115 - Page 3 of 4

CHAP-04.11 AUTOMATION Page 1 of 15 04.11 AUTOMATION SYSTEM (LEVEL-1) 04.11.01 GENERAL 01. This specification is intended to defin

Page 116 - Page 4 of 4

CHAP-04.11 AUTOMATION Page 2 of 15 system as per Automation Configuration Diagram (MEC/S/9101/11/E9/55/01/064.02/R1).  In the new Automation